1161-001.pdfStability DemonstrationDownload05/30/2019 02:03:41 PM

Operating Criteria

Document NameDescriptionView DocumentUpdated
2023 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-23)-signed.pdfBonanza Power Plant, Annual PE Inspection 2023Download01/23/2025 04:16:15 PM
2022 Bonanza Power Plant, CCR Units Annual PE Inspection (11-8-22)-signed.pdfBonanza Power Plant, Annual PE Inspection 2022Download01/23/2025 04:16:00 PM
2021 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-21)-signed.pdfBonanza Power Plant, Annual PE Inspection 2021Download01/23/2025 04:15:48 PM
2020 Bonanza Power Plant, CCR Units Annual PE Inspection (11-5-20)-signed.pdfBonanza Power Plant, Annual PE Inspection 2020Download01/23/2025 04:15:32 PM
Fugitive Dust Control Report 2024.pdf2024 Fugitive Dust Control ReportDownload01/23/2025 04:08:51 PM
Fugitive Dust Control Report 2023.pdf2023 Fugitive Dust Control ReportDownload01/23/2025 04:08:38 PM
Fugitive Dust Control Report 2022.pdf2022 Fugitive Dust Control ReportDownload01/23/2025 04:08:15 PM
Fugitive Dust Control Report 2021.pdf2021 Fugitive Dust Control ReportDownload01/23/2025 04:07:56 PM
Fugitive Dust Control Report 2020.pdf2020 Fugitive Dust Control ReportDownload01/23/2025 04:07:33 PM
2024 Bonanza Power Plant, CCR Units Annual PE Inspection(11-11-24)-signed.pdfBonanza Power Plant, Annual PE Inspection 2024Download01/23/2025 03:49:37 PM
Run On Run Off Plan.pdfInitial Bonanza Power Plant CCR Units Run On Run Off PlanDownload09/19/2024 09:46:08 AM
2015 Fugitive Dust Control Plan (Revised 10-15-15)-signed.pdfCCR Fugitive Dust Control PlanDownload09/19/2024 09:42:26 AM
Bonanza Power Plant CCR Units Run On Run Off Plan V3.pdfBonanza Power Plant, CCR Landfill Run On Run Off Control Plan (Fly Ash & Bottom Ash Landfills)Download09/30/2021 09:20:15 AM

Ground Monitoring and Corrective Action

Document NameDescriptionView DocumentUpdated
2024 Bonanza AGMCAR_final_reduced.pdf2024 Annual Groundwater ReportDownload02/20/2025 07:18:15 AM
2023 Annual Bonanza CCR GWM and CA Report_Final.pdf2023 Annual Groundwater ReportDownload01/23/2025 04:14:15 PM
2022 Annual Bonanza CCR GWM and CA Report_JAN 2023.pdf2022 Annual Groundwater ReportDownload01/23/2025 04:13:54 PM
2021 Annual Bonanza CCR GWM and CA Report_final_compiled.pdf2021 Annual Groundwater ReportDownload01/23/2025 04:13:22 PM
2020 Annual Bonanza CCR GWM and CA Report rev1.pdf2020 Annual Groudwater Report Rev1Download01/23/2025 04:12:59 PM
Monitoring Well As-Built rev2.pdfMonitoring Well Network - Construction DocumentsDownload10/14/2024 05:14:45 PM
FINAL_Stat Method Certification_Bonanza(10-16-17)_COLOR.pdfGroundwater Statistical Method CertificationDownload10/16/2017 02:00:35 PM
As-Built Wells Profiles.pdfGroundwater Monitoring Design DocumentDownload10/16/2017 08:46:58 AM
20151117__BONANZA_PLANT_SITE_ASH_PILES_FOOTPRINT_PLAN (5-10-16) R2.pdfGroundwater Monitoring Design DocumentDownload10/16/2017 08:46:41 AM
2016 Bonanza Power Plant CCR Monitoring Well Specifications (final).pdfGroundwater Monitoring Design DocumentDownload10/16/2017 08:46:26 AM
FINAL_Certification of GW Monitoring System_Bonanza(10-12-17)_COLOR.pdfGroundwater Monitoring System CertificationDownload10/16/2017 08:43:37 AM

Closure and Post-Closure Care

Document NameDescriptionView DocumentUpdated
CCR-CLOSURE PLAN 2016-PDF rev1.pdfBonanza Power Plant, Written Post-Closure PlanDownload09/23/2019 09:56:55 AM
CCR-CLOSURE PLAN 2016-PDF rev1.pdfBonanza Power Plant, Written Closure PlanDownload09/23/2019 09:55:40 AM