2021 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-21)-signed.pdf | Bonanza Power Plant, Annual PE Inspection 2021 | Download |
Fugitive Dust Control Report 2021.pdf | 2021 Fugitive Dust Control Report | Download |
Bonanza Power Plant CCR Units Run On Run Off Plan V3.pdf | Bonanza Power Plant, CCR Landfill Run On Run Off Control Plan (Fly Ash & Bottom Ash Landfills) | Download |
2020 Bonanza Power Plant, CCR Units Annual PE Inspection (11-5-20)-signed.pdf | Bonanza Power Plant, Annual PE Inspection 2020 | Download |
Fugitive Dust Control Report 2018.pdf | 2018 CCR Fugitive Dust Control Report | Download |
Fugitive Dust Control Report 2020.pdf | 2020 Fugitive Dust Control Report | Download |
2019 Bonanza Power Plant, CCR Units Annual PE Inspection (11-7-19)-signed.pdf | Bonanza Power Plant, Annual PE Inspection (11-7-19) | Download |
Fugitive Dust Control Report 2019.pdf | 2019 CCR Fugitive Dust Control Report | Download |
2017 Fugitive Dust Control Report.pdf | 2017 CCR Fugitive Dust Control Report | Download |
2018 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-18)-signed.pdf | Bonanza Power Plant, Annual PE Inspection | Download |
2017 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-17)-signed.pdf | Bonanza Power Plant, Annual PE Inspection (11-9-17) | Download |
Fugitive Dust Control Plan (Revised 10-15-15)-signed.pdf | Bonanza Power Plant, Fugitive Dust Control Plan (Revised 10-15-15) | Download |