Environmental

Images

Content

CCR Rule Compliance Data and Information

Location Restrictions

Document NameDescriptionView Document
1161-001.pdfStability DemonstrationDownload

Operating Criteria

Document NameDescriptionView Document
Bonanza Power Plant CCR Units Run On Run Off Plan V3.pdfBonanza Power Plant, CCR Landfill Run On Run Off Control Plan (Fly Ash & Bottom Ash Landfills)Download
2016 Fugitive Dust Control Report.pdf2016 CCR Fugitive Dust Control ReportDownload
2020 Bonanza Power Plant, CCR Units Annual PE Inspection (11-5-20)-signed.pdfBonanza Power Plant, Annual PE Inspection 2020Download
Fugitive Dust Control Report 2018.pdf2018 CCR Fugitive Dust Control ReportDownload
Fugitive Dust Control Report 2020.pdf2020 Fugitive Dust Control ReportDownload
2019 Bonanza Power Plant, CCR Units Annual PE Inspection (11-7-19)-signed.pdfBonanza Power Plant, Annual PE Inspection (11-7-19)Download
Fugitive Dust Control Report 2019.pdf2019 CCR Fugitive Dust Control ReportDownload
2017 Fugitive Dust Control Report.pdf2017 CCR Fugitive Dust Control ReportDownload
2018 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-18)-signed.pdfBonanza Power Plant, Annual PE InspectionDownload
2017 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-17)-signed.pdfBonanza Power Plant, Annual PE Inspection (11-9-17)Download
2016 Bonanza Power Plant, CCR Units Annual PE Inspection (11-9-16)-signed.pdfBonanza Power Plant, Annual PE Inspection (11-9-16)Download
Fugitive Dust Control Plan (Revised 10-15-15)-signed.pdfBonanza Power Plant, Fugitive Dust Control Plan (Revised 10-15-15)Download

Ground Monitoring and Corrective Action

Document NameDescriptionView Document
2020 Annual Bonanza CCR GWM and CA Report.pdf2020 Annual Groundwater ReportDownload
Initial CCR Annual GW Mon and CA Report (1.31.2018).pdf2017 Annual Groundwater ReportDownload
2019 Annual Bonanza CCR GWM and CA Report.pdf2019 Annual Groundwater ReportDownload
2018 Annual Bonanza CCR GWM and CA Report.pdf2018 Annual Groundwater ReportDownload
FINAL_Stat Method Certification_Bonanza(10-16-17)_COLOR.pdfGroundwater Statistical Method CertificationDownload
As-Built Wells Profiles.pdfGroundwater Monitoring Design DocumentDownload
20151117__BONANZA_PLANT_SITE_ASH_PILES_FOOTPRINT_PLAN (5-10-16) R2.pdfGroundwater Monitoring Design DocumentDownload
2016 Bonanza Power Plant CCR Monitoring Well Specifications (final).pdfGroundwater Monitoring Design DocumentDownload
FINAL_Certification of GW Monitoring System_Bonanza(10-12-17)_COLOR.pdfGroundwater Monitoring System CertificationDownload

Closure and Post-Closure Care

Document NameDescriptionView Document
CCR-CLOSURE PLAN 2016-PDF rev1.pdfBonanza Power Plant, Written Post-Closure PlanDownload
CCR-CLOSURE PLAN 2016-PDF rev1.pdfBonanza Power Plant, Written Closure PlanDownload